View single post by Steve P
 Posted: Sun Sep 2nd, 2018 08:35 pm
PMQuoteReplyFull Topic
Steve P

 

Joined: Fri Apr 20th, 2018
Location:  
Posts: 85
Status: 
Offline
 
Hi,

The turnaround is finished.


The mainline enters here. There will be a tunnel thru the fence..




It is about 6' off the ground at the high point.




The consist returns to the main line here. There will be a tunnel the length of the concrete block base.




Tunnels are next, followed by a "mountain" covering them.

Steve P


Close Window