View single post by Steve P
 Posted: Mon Sep 3rd, 2018 03:23 pm
PMQuoteReplyFull Topic
Steve P

 

Joined: Fri Apr 20th, 2018
Location:  
Posts: 76
Status: 
Offline
 
Si,

I am using turboCAD as we speak to design a concrete form for the 2 tunnels where the main/turnaround passes thru the inner yard fence.
Weather permitting I should be able to pour the 1st tunnel tomorrow, then the 2nd several days later
(re-using the form so have to wait 2-3 days before stripping).

After that I am going to build a "mountain" on top of them,
with a combination of tan breeze and granite rip-rap left over from a previous dig on the property.

Steve P.


Close Window