View single post by Reg H
 Posted: Wed Nov 14th, 2018 03:44 pm
PMQuoteReplyFull Topic
Reg H



Joined: Sun Oct 19th, 2014
Location: Shelton, USA
Posts: 997
Status: 
Offline
Alan:

I haven't determined the orientation of the mill on the layout yet.   
I want to get it completed and then try out different locations and orientations.  

I had a brainstorm last night that may allow me to install the entire complex, which would be really cool.  
But until I have enough complete to try out some places and see how I can make the track configuration work, all is still up in the air.

This is one of those structures that I will probably complete all sides even if some won't be visible,
with the possible exception of the cross bracing under the building. 

Reg




____________________
Reg
Close Window