View single post by Steven B
 Posted: Tue Dec 3rd, 2019 11:33 am
PMQuoteReplyFull Topic
Steven B



Joined: Thu Aug 13th, 2015
Location: Virginia USA
Posts: 493
Status: 
Offline
Drats!  

I had this problem on my former HO layout.  I had built the structure on a piece of plywood and had tracks running through it.  I needed the tracks to obviously match up with the lead.  Grrr.  

So I cut out the foam and shimmed the plywood directly onto the benchwork until it all matched up, then secured both the lead and plywood base to prevent earthquakes from messing with the alignment.  Fortunately you don't have to worry about track height  problems as far as operations go.  

:dt:



____________________
Steven B.
Humboldt & Toiyabe Rwy
Close Window