Left end.

Large piping is the water supply to the Pelton-Doble Turbine.

Smaller line was the air supply line,
from an Ingersol-Rand compound air compressor,
which ran up to the mine itself.

Electrical power from the 2 Megawatt Westinghouse generator,
feed both the mine and the Silversmith Mill.