View single post by Robert Comerford
 Posted: Sat Feb 4th, 2017 11:08 pm
PMQuoteReplyFull Topic
Robert Comerford

 

Joined: Thu Feb 14th, 2013
Location: Glen Innes, Australia
Posts: 576
Status: 
Offline
I put the hours in yesterday after the glue had set and laid in a loop of track.
Enough DCC bus was installed under the layout to allow the track to be wired so a train could circulate.
Here is that first train.

The track is being held to the foam with staples made from paper clips. I do this until finally ballasting when all is in its permanent position. The track will also have cork  inserted under it at some time to help form the ballast shoulder.
Cheers
 Bob


Attachment: first train.jpg (Downloaded 102 times)

Close Window