View single post by Robert Comerford
 Posted: Mon Feb 6th, 2017 12:17 pm
PMQuoteReplyFull Topic
Robert Comerford

 

Joined: Thu Feb 14th, 2013
Location: Glen Innes, Australia
Posts: 576
Status: 
Offline
Here we see the state of play after the second day of track laying.
The inner circuit is done but yet to be wired.

I will need to make a CDU for the layout as the point to the future storage sidings is not easy to get to so will have to be motored.
Might actually lay the storage sidings in code 100 just in case someone comes with a model equipped with pizza cutter wheels for me to test.
cheers
 BobC

Attachment: track night 2.jpg (Downloaded 86 times)

Close Window