View single post by Tony M
 Posted: Tue Jul 11th, 2017 01:11 pm
PMQuoteReplyFull Topic
Tony M



Joined: Thu Mar 13th, 2014
Location: Ipswich, Queensland, Australia
Posts: 448
Status: 
Offline
Nearly done with the points on this module, a tip to the local hobby shop in Ipswich will complete the module, then I will mark where to drill and lift he points and double slip cross over drill the holes for the switching pin nail the points back down.

Then nail the track down, next job make the mini bus plug adjustable panel, finely the bus wiring, completing another module a week later, this be the last module that has a lot of points on it, next module two points  and diamond cross over.

Only a couple of curves sections have a two points, be a lot quicker to nail the track down.nearly there.

Tony from down under.



Attachment: DSCF1485 a.jpg (Downloaded 41 times)

Close Window