Freerails Home 
Home Search search Menu menu Not logged in - Login | Register

Freerails is accepting new Members ... To join Freerails ... See how to Register as a Member in the 'Joining Freerails' Forum

APPETITE MINE.
 Moderated by: W C Greene Page:  First Page Previous Page  ...  27  28  29  30  31  32   
New Topic Reply Printer Friendly
 Rating:  Rating
AuthorPost
 Posted: Sat Jan 27th, 2018 09:03 pm
  PMQuoteReply
311th Post
Charley
Registered


Joined: Sat Mar 6th, 2010
Location: Beatty, Nevada USA
Posts: 717
Status: 
Offline
Larry , Fellers...
The foam / filter , hedge trick is a good idear..I will keep it in mind  for future use..thanks..



____________________
Charley
Back To Top

 Posted: Fri Feb 9th, 2018 04:26 pm
  PMQuoteReply
312th Post
Larry G
Registered


Joined: Wed Jun 15th, 2016
Location: Rapid City, South Dakota USA
Posts: 324
Status: 
Offline
With further checking, I found that the Black Hills has some of the best Apatite crystals to be found anywhere. Haven't found anything about large deposits of gem stone or Apatite ore so far. Now that I know Apatite is real, I would like to have my layout reflect a actual Apatite mine.
So, I will keep checking on Apatite in the Black Hills.
Larry G

Back To Top

 Posted: Sun Feb 11th, 2018 06:30 pm
  PMQuoteReply
313th Post
Larry G
Registered


Joined: Wed Jun 15th, 2016
Location: Rapid City, South Dakota USA
Posts: 324
Status: 
Offline
Been doing a bit more work on the land forms near the incline hoist. More cardboard and hot glue. I like scenery above and below the track level when ever possible.  LG

Attachment: DSC00001 2.jpg (Downloaded 24 times)

Back To Top

 Posted: Sun Feb 11th, 2018 06:40 pm
  PMQuoteReply
314th Post
Larry G
Registered


Joined: Wed Jun 15th, 2016
Location: Rapid City, South Dakota USA
Posts: 324
Status: 
Offline
All but 6" of the upper level trackwork is finished. After the hoist is installed and working well, the last 6" of track will be finished. Track on the far side of the host can be finished then also. The gap in the roadbed is where the incline hoist will be installed.   LG

Attachment: DSC00003.jpg (Downloaded 25 times)

Back To Top

 Posted: Sun Feb 11th, 2018 06:46 pm
  PMQuoteReply
315th Post
Larry G
Registered


Joined: Wed Jun 15th, 2016
Location: Rapid City, South Dakota USA
Posts: 324
Status: 
Offline
A closer view of the eventual hoist site. I've been avoiding the challenge of building the hoist long enough, time to get off my big fat chair and have at it.  LG

Attachment: DSC00002.jpg (Downloaded 25 times)

Last edited on Mon Feb 12th, 2018 12:02 am by Larry G

Back To Top


 Current time is 05:31 am
Page:  First Page Previous Page  ...  27  28  29  30  31  32   

Top



UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems