Freerails Home 
Home Search search Menu menu Not logged in - Login | Register
Freerails > Model Railroad Forums > On30 > Alpine Flats Railroad project

Because of non-railroad abuse of the site, new members MUST use their first names (at least) to join NO EXCEPTIONS!

Alpine Flats Railroad project
 Moderated by: Reg H Page:  First Page Previous Page  1  2  3  4   
New Topic Reply Printer Friendly
 Rate Topic 
AuthorPost
 Posted: Fri Dec 22nd, 2017 09:01 pm
  PMQuoteReply
31st Post
Jonah K
Registered
 

Joined: Mon Jun 19th, 2017
Location:  
Posts: 19
Status: 
Offline
So it's been a while since an update, and I feel like I should tell you the status of the real road right now!

Track work was completed with a funky two stall engineer house for the 4-4-0 and a porter. I eventually got annoyed with the configuration and ripped out the track in preparation for a roundtable. For now that project is on a back burner when I determine the size after new locomotive acquisitions.

Onto to the new locomotives, the OF 4-4-0 is at Bachmann so I am awaiting it to return. As of running locomotives, I now have a 0-4-2, Climax, Forney, and a 4-6-0. The Ten Wheeler is for a future On3 project, so the rest will be for the mining railroad. The 0-4-2 and Climax both sound, so I've been working on the Forney to have DCC Sound as well.

The only rolling stock is a variety mix of words side dumps and V-dumps. Hopefully I'm trying to get a Derrick car and some MOW cars to round off the collection!

Will take pictures of the layout and it's unfinished buildings when I get home though.
-Jonah K

Last edited on Fri Dec 22nd, 2017 09:02 pm by Jonah K

Back To Top


 Current time is 02:30 pm
Page:  First Page Previous Page  1  2  3  4   

Freerails > Model Railroad Forums > On30 > Alpine Flats Railroad project
Top



UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems