Freerails Home 
Home Search search Menu menu Not logged in - Login | Register
Freerails > Model Railroad Forums > Track Planning > Mountain 'Big Boy' Track

Freerails IS ACCEPTING new Members ... To join Freerails ... See how to Register as a Member in the 'Joining Freerails' Forum

Mountain 'Big Boy' Track
 Moderated by: Herb Kephart Page:  First Page Previous Page  1  2   
New Topic Reply Printer Friendly
 Rate Topic 
AuthorPost
 Posted: Fri Aug 3rd, 2018 06:59 pm
  PMQuoteReply
11th Post
Steve P
Registered
 

Joined: Fri Apr 20th, 2018
Location:  
Posts: 39
Status: 
Offline
Hi,

Bigboy arriving next Wednesday, depot almost ready:

Steve P

Attachment: IMG_0353-960x720.JPG (Downloaded 37 times)

Back To Top

 Posted: Fri Aug 3rd, 2018 07:07 pm
  PMQuoteReply
12th Post
Steve P
Registered
 

Joined: Fri Apr 20th, 2018
Location:  
Posts: 39
Status: 
Offline
Hi,

Bridge to the orchard (with mainline, a/d tracks & drill track) is started:

Steve P

Attachment: IMG_0354-960x720.JPG (Downloaded 29 times)

Back To Top

 Posted: Thu Aug 16th, 2018 08:11 pm
  PMQuoteReply
13th Post
Steve P
Registered
 

Joined: Fri Apr 20th, 2018
Location:  
Posts: 39
Status: 
Offline
Hi,

Phase I of the track is complete.  First pic is the far end of bridge, which will have a turnaround added as part of phase II.

Second pic is the bridge as seen from  upper deck of house.

Third pic is the view of the bridge from the freight yard.

Note that only the main line is complete.  The A/D track, drill track and freight yard feather are unfinished.  That's another $2500 worth of switches and track, maybe next year...

The turn around will start next week.  I hope to finish that, as well as a couple of tunnels thru that fence for the main line and the turn around before winter sets in.

Steve P


Hi,

0

Last edited on Thu Aug 16th, 2018 08:21 pm by Steve P

Back To Top

 Posted: Thu Aug 16th, 2018 10:40 pm
  PMQuoteReply
14th Post
slateworks
Registered


Joined: Wed Oct 6th, 2010
Location: Twickenham, United Kingdom
Posts: 618
Status: 
Offline
Crikey! That's one heck of a trestle!



____________________
Doug
Updah Creek http://www.freerails.com/view_topic.php?id=7457&forum_id=4&page=1
My Flickr albums https://www.flickr.com/photos/33431492@N04/albums
Back To Top

 Posted: Thu Aug 16th, 2018 10:52 pm
  PMQuoteReply
15th Post
Steve P
Registered
 

Joined: Fri Apr 20th, 2018
Location:  
Posts: 39
Status: 
Offline
Hi,

I had a difficult design problem.  The main depot area had to be incorporated into the patio area, the only real outdoor area that made sense.  But I live on the side of a mountain, so that meant no easy way to run track from that point.  The bridge/trestle not only gets me to the point where I can run the main line up thru my valley, but is a usable place to put a pair of reasonable length arrival/departure tracks as well as a drill track long enough to assemble a 60 boxcar consist for the Big Boy.  There is not a level area on the entire property large enough to do that...

Steve P

Back To Top


 Current time is 02:31 am
Page:  First Page Previous Page  1  2   

Freerails > Model Railroad Forums > Track Planning > Mountain 'Big Boy' Track
Top



UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems