Freerails Home 
Home Search search Menu menu Not logged in - Login | Register
Freerails > Model Railroad Forums > Track Planning > Expanding - 'The Yellow Creek Western' - On30

Freerails IS ACCEPTING new Members ... To join Freerails ... See how to Register as a Member in the 'Joining Freerails' Forum

Expanding - 'The Yellow Creek Western' - On30
 Moderated by: . Page:  First Page Previous Page  ...  15  16  17  18  19  20   
New Topic Reply Printer Friendly
 Rating:  Rating
AuthorPost
 Posted: Tue Oct 15th, 2019 04:14 pm
  PMQuoteReply
191st Post
Tom Harbin
Registered
 

Joined: Sat Sep 1st, 2018
Location: Arizona USA
Posts: 270
Status: 
Offline
Steven,

Thank you!

I didn't think about it but if I combine the tunnel idea from V1 with the rest of V3 it should work very well.
The big problem with the tunnel in V1 was making a believable wagon-width switchback that didn't make the freight spur too short.
If I take the tunnel from V1 and plop it on V3 I can have the road come down behind the buildings and fork into Railroad Ave.
Basically just continue the curved hunk of foam down the "mountain" behind the houses,
and connect it near the edge of the old layout to the main street.

The plan was for a small Kitwood Hills turntable
(I was thinking 9 inch but needed to double check that my 4-4-0 would turn okay on it)
but now it will need to be scratch-built.

I may need to travel to Texas for a while and hang out with Woodie to see if scratch-building is contagious.
Yesterday he sees one photo of a harp stand in Pennsylvania and today he has a scratch-built brass replica.
Unbelievable.

This forum is just chocked full of talent.

Once I get further along I will need to post pictures for Si to critique.
Seems I like to put my points in the worst possible configuration for actually operating a train.

:bang:

I can't do any detail work right now,
so moving big stuff around on the layout will have to suffice.

Also I need to give some serious consideration of my plans for power.
I was planning to go all BPRC but it looks like I can't do it for much less than $50.00/engine.
I already have a full compliment of DCC engines and power/throttles.
I'm not sure I can cost justify that at this point.

Until I make that decision laying track is also on hold,
although I could always just wire for DCC and not use it if I get BPRC going.

Tom


Back To Top

 Posted: Tue Oct 15th, 2019 04:32 pm
  PMQuoteReply
192nd Post
Tom Harbin
Registered
 

Joined: Sat Sep 1st, 2018
Location: Arizona USA
Posts: 270
Status: 
Offline
Steven,

Forgot to answer about the mines.

Originally it was going to be a line from two mines down to a stamp mill, or maybe smelter,
with a connecting line to the outside world and a lumber camp.

Somehow it morphed into an old west town center to nowhere.
Oh well, I only own three ore cars anyway.

You bring up a good point.
I will try to place a couple of stubs to the outside world.
Never can tell what the future holds. 

Tom


Back To Top

 Posted: Fri Nov 1st, 2019 06:15 am
  PMQuoteReply
193rd Post
Tom Harbin
Registered
 

Joined: Sat Sep 1st, 2018
Location: Arizona USA
Posts: 270
Status: 
Offline
 
I haven't done much MRR in the last two weeks,
but I did get a roof on the Land Office/Meat Market/Junqueologist building.















Tom


Back To Top

 Posted: Fri Nov 1st, 2019 04:08 pm
  PMQuoteReply
194th Post
W C Greene
Moderator


Joined: Fri May 4th, 2007
Location: Royse City, Texas USA
Posts: 8241
Status: 
Offline
Tom, great work!
I'm glad that you put a roof on the junqueologist's office,
it has been raining here for a few days.

W C Greene





____________________
It doesn't matter if you win or lose, its' how you rig the game.
Back To Top

 Posted: Sat Nov 2nd, 2019 02:22 am
  PMQuoteReply
195th Post
Tom Harbin
Registered
 

Joined: Sat Sep 1st, 2018
Location: Arizona USA
Posts: 270
Status: 
Offline
Sorry Woodie,

If I'd know I would have put it on sooner.  :bg:

Last time it rained here was a couple of evenings back in July or maybe early August.

Probably won't get anymore until after the new year.

Tom


Back To Top


 Current time is 07:46 pm
Page:  First Page Previous Page  ...  15  16  17  18  19  20   

Freerails > Model Railroad Forums > Track Planning > Expanding - 'The Yellow Creek Western' - On30
Top



UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems