View single post by Ken C
 Posted: Wed Nov 18th, 2020 04:34 pm
PMQuoteReplyFull Topic
Ken C



Joined: Tue Jun 16th, 2015
Location:  Calgary, Alberta Canada
Posts: 994
Status: 
Offline
 
John

Always worth seeing more photos of the Corrimal Colliery incline.

Slowly working on a 3 rail incline for a model.
Will only be 2 feet in length, top end will be in a snow shed as per the prototype.

Looking at adding a sector plate to allow operation.
The prototype had a run of 5500 feet, with a drop of 2300 feet.

Lower terminal building 95% done,
need to extend framing on current layout frame to support it on pilings.

Ken




____________________
Ken Clark
GWN

Kaslo & Slocan Railway
International Navigation & Trading Co
Kootenay Railway & Navigation Co.
Close Window