View single post by Mikel Parker
 Posted: Mon Mar 21st, 2022 09:52 pm
PMQuoteReplyFull Topic
Mikel Parker



Joined: Mon Oct 1st, 2018
Location: Portland, Oregon USA
Posts: 281
Status: 
Offline
 
So next I drilled, and added truss rods, from provided wire.

Kinda tricky to get angle and nut/bolt/washer castings in
(tiny town, and these aren't even the small ones).

Added small pieces of paper,
to represent washers between bolster supports,
and then added smaller NBW castings to areas required.


Attachment: RGS 02 6.jpeg (Downloaded 57 times)



____________________
mikel
Close Window