View single post by JohnB
 Posted: Sat Apr 23rd, 2011 06:01 pm
PMQuoteReplyFull Topic
JohnB

 

Joined: 
Location:  
Posts: 
Status: 
Offline
I simply wire them in series, two to a smallish building, and power them off the 16V AC of a power pack. Although I have a walkaround system for controlling trains, I have a couple of "legacy" power packs that I use for switch machines, building lighting, and so forth. I have structures that are 20 years old with the lighting still doing fine.

Close Window